30th April 2020

  • Store room with boiler and tank and lots of pipework. This is where the ladies toilets were.

  • Looking across the rear vestibule to the schoolroom door and, on the right, to the back door.

  • The schoolroom, showing the radiators and the new lights.

  • The schoolroom looking the other way, showing the door and the enlarged hatch. The boiler cupbaord has gone.

  • The Prayer Room

  • The Vestry.

  • A very first look at the Mezzanine floor, over the entrance to the worship area. The lancet windows are seen on the right.

  • The front of the worship area. The original arched recess has been preserved and remodelled to accommodate the ceiling.

  • Looking towards the back of the worship area, showing the lancet windows, a central door and two spaces for glass.

A few new photos of the building project. Work is continuing with social distancing measures in place. 

Return to top of page