j.18th June 2020

  • Suspended ceiling being fitted, showing an air conditioning/heating unit.

  • Looking to the front of the worship area.

  • One of the toilet cubicles, tiled and painted and waiting for the sanitary-ware.

  • The washbasin area next to the toilets.

  • The hall/schoolroom, showing the radiators and the sanded floor.

Work is moving at a steady pace at Radcliffe-on-Trent Methodist Church.  It is hoped that the work will be finished by 24th July.

Return to top of page